Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Bonn DE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Bonn DE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Kościerzyna PL
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Kvissleby SE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Radków PL
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Wuppertal DE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Nacka SE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Stenungsund SE
Det mest brukte IKKE-EKSPLOSIVT rivningsmiddelet i Europa: Teknisk support hver dag: info@dynacem.com
UTVIDER OG BRUKER STILLE
Suchedniów PL
UTVIDER OG BRUKER STILLE
Bonn DE
UTVIDER OG BRUKER STILLE
Bonn DE
UTVIDER OG BRUKER STILLE
Kościerzyna PL
UTVIDER OG BRUKER STILLE
Kvissleby SE
UTVIDER OG BRUKER STILLE
Kvissleby SE
UTVIDER OG BRUKER STILLE
Wuppertal DE
UTVIDER OG BRUKER STILLE
Wuppertal DE
UTVIDER OG BRUKER STILLE
Śmiłów PL
UTVIDER OG BRUKER STILLE
Grålum NO
UTVIDER OG BRUKER STILLE
Rheine DE

Drilling the holes and Dynacem action will produce incomparably less damage to the house and walls, and less noise than hammering.

Stage 1
If the slab has free edges, go to Stage 2.
The procedure is demonstrated on the sketch below.
There are three possible options of Step 1 to choose from.
Drill near the walls and fill the rows of inclined (30-45 degrees) holes A.
Alternatively, drill vertical holes B, located as close to the wall as possible, together with corresponding iclined holes A.
When extremal protection is needed for the walls, drill the holes C, B and A as sketched, and fill holes B and A only. Fill holes C after delamination and removal of cracked concrete from between the holes B and A.
Remove cracked concrete from the whole area near the walls and proceed to Step 2.

S - hole spacing in square drill pattern
h - drilling depth
Stage 2.
To break internal part of the slab, holes D are used in square drill pattern.
Hole diameter: 30 mm in non-reinforced concrete above 10 deg C, 40 mm is recommended in all other cases. Smaller diameters may also work, but with worser results and in the longer time.

The following conditions must be met at the same time.
S < 2h when non-reinforced concrete slab rests on plastic foil/styrofoam/sand (any sliding support) and whole slab thickness is removed,
or S ≤ h in all other cases.
S < 10 hole diameters when the slab is made of reinforced concrete, or S ≤ 15 hole diameters when the slab is made of non-reinforced concrete.
h ≥ 5 hole diameters (holes can be drilled at an angle in thinner slabs to increase drilling depth).
h > 85 % of the slab thickness being removed (the deeper the hole, the better Dynacem action).

Hole spacing should not exceed 30 cm if the rubble will be removed manually or with hand tools (larger hole spacing can be used when larger chunks will be removed by the excavator).

One (preferably) or two outer rows of holes should be filled every 24 hours. Move the cracked concrete away from the uncracked inside of the slab every day.

Example 1
Non-reinforced concrete slab 30 cm thick, resting on sand, temperature 20 deg C.
Cracked chunks will be removed manually.
Hole diameter: 30 mm
Hole spacing S = 30 x 30 cm (you can drill holes in the 30x30 cm grid nodes or you can follow the sketch below where the holes are spaced 30x30 cm basing on the 26x30 cm grid)
Drilling depth h = 27 cm

Example 2
Reinforced concrete slab 50 cm thick, resting on plastic film, temperature 20 deg C.
Cracked concrete will be removed with excavator after Dynacem raction.
Hole diameter: 40 mm
Hole spacing S = 35 x 35 cm
Drilling depth h = 45 cm