NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Bonn DE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Bonn DE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Kościerzyna PL
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Kvissleby SE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Radków PL
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Wuppertal DE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Nacka SE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Stenungsund SE
NON-EXPLOSIVE DEMOLITION AGENT: Tech support 7 days a week: info@dynacem.com
SOUNDLESS CRACKING AND SPLITTING
Suchedniów PL
SOUNDLESS CRACKING AND SPLITTING
Bonn DE
SOUNDLESS CRACKING AND SPLITTING
Bonn DE
SOUNDLESS CRACKING AND SPLITTING
Kościerzyna PL
SOUNDLESS CRACKING AND SPLITTING
Kvissleby SE
SOUNDLESS CRACKING AND SPLITTING
Kvissleby SE
SOUNDLESS CRACKING AND SPLITTING
Wuppertal DE
SOUNDLESS CRACKING AND SPLITTING
Wuppertal DE
SOUNDLESS CRACKING AND SPLITTING
Śmiłów PL
SOUNDLESS CRACKING AND SPLITTING
Grålum NO
SOUNDLESS CRACKING AND SPLITTING
Rheine DE

A 5 kg box of Dynacem is usually enough to break 0.55 m3 of concrete or 0.35 m3 of hard rock, or to break or split loose rocks or boulders with a volume of 1 to 5 m3 (depending on the desired size of the split pieces).

A 20 kg box is usually enough for 2.2 m3 of concrete or 1.4 m3 of hard rock, or 4 to 20 m3 of loose rocks or boulders (as above).

It is best to determine the need for Dynacem powder on the basis of the diameter and length of the holes. Approximate DYNACEM quantity required to fill a hole of 1 m depth as a function of hole diameter:

diameter ⌀ [mm]
10 16 22 26 28 30
Dynacem [kg] 0,14 0,4 0,7 1,0 1,1 1,3
diameter ⌀ [mm]
32 34 36 38 40 42
Dynacem [kg] 1,4 1,6 1,8 2,0 2,2 2,5

 

Resulting consumption of the silent cracking agent DYNACEM depends on the desired way of demolition:

Breaking

is achieved by placing holes in a square drill pattern, which results in damage of the entire volume of the element.

DYNACEM consumption is high and is approximately equal to:

- loose rocks and boulders: 1 - 5 kg/m(kg of Dynacem powder per m3 of rock/concrete)
- solid rock: 5 - 20 kg/m3
- concrete: 5 - 15 kg/m3
- reinforced concrete: 10 - 30 kg/m3

Dynacem consumption [kg/m3] for breaking rock and concrete to remove the top layer (part of the thickness) from a solid substrate, with various hole diameters ⌀ and hole spacings S:

Hole diameter

[mm]

Hole spacing S in square drill pattern S x S [cm]:
25 30 35 40 45 50
⌀=24 13 9 6,5 5    
⌀=26 16 11 8 6 5  
⌀=28 17,5 12 9 7 5,5 4,5
⌀=30 21 14 10,5 8 6,5 5
⌀=32 22 15,5 11,5 9 7 5,5
⌀=34 25,5 18 13 10 8 6,5
⌀=36 29 20 15 11 9 7
⌀=38 32 22 16 12,5 10 8
⌀=40 35 24,5 18 14 11 9
⌀=42   28 20 15,5 12 10

Darker cells indicate the consumption for typical combinations of hole diameter and hole spacing being used for hard and very hard rock.

Dynacem consumption [kg/m3] for removing the full thickness of a solid layer being separated from the substrate (e.g. rock with natural horizontal cracks or concrete slabs on plastic sheet) may be up to 50 % lower than the values ​​given in the table above.

Dynacem consumption [kg/m3] for breaking loose rocks and boulders is around 1 - 5 kg/m3.

Dividing

is achieved by linear hole distribution, which results in the element being "cut" into blocks fit for loading and transport.

Holes of 10 to 40 mm diameter (⌀) are drilled at intervals
S = 10⌀

DYNACEM consumption depends mainly on the desired block size and is approximately equal to:

0,5 - 5 kg/m3